CASE JIKE

Field pipeline welding projects
发布人:吉克
时间:2023-04-14
浏览数:

At the construction site of the pipeline network, the 250A Diesel Welder Generator is under testing, and the user is sharing the operating feeling. With a 40 meters long welding cable,  continuous welding for 4φ electrode is pressure free, smooth and stable!

 


下一篇:没有了
吉克JIKE